裝配步驟

       heli123.gif (11043 bytes)                                                                                      

 

  The assembly instructions of the thread insertIt consists of drilling、tapping、bottom detect、installation of thread insert and break-offtool,

 mainly, thread detect、the six assembly instructions follows:   

                                                                                                      

  1、Drilling:
      The taper should be selected suitably from the dimension of do in the table and be sharpened accurately The chamfer is inappropriate to exceed t       he depth of 0.4p after tapping. the best chamfer is 120°, which makes against setting of thread insert if it is too big.
                                                                                                                     



 2、Tapping:

The special screw tap corresponding to the thread insert is selected to use (using lubricant oil or grease for this operation) when the through

 hole is tapped, the force should be appropriate to prevent taper rupturing. After tapping the tape hole should be cleared.                                                                                  

       

 




 

     3、Bottom detect:

     Clean up bottom clastic after tapping, detected the pass and stop instrumeat of bottom by bottom plug before theinstallation.

      

                                                                                                              






4、Installation of thread insert: 

Insert the tool in the dilled hole lower than thethread insert into the tapping pressure.

                                                                                                             
       


      



    5、Break-offtool:

    Break the tail off using the break-off tool in order to use the whole length of the tapping                                                                                                                           

 


 

 

  6、Thread detect:
        After installing the screw sets, detected the  pass and stop instrument by thread plug guge.

 



7: a screw, steel wire during the installation process problems, or because the wire use time is too long a screw wire can be removed,

 should be used with a blade sleeve tool on the port, a screw with a hammer blow, with the hand to press the handle to the thread tension 

spinning can exit steel wire spiral sets.

 







 

99热这里精品
一本久道久久丁香狠狠躁|hmj887 38在线电影|9tv272 中文字幕在线播放|yg9319 国产精品一区成人精品|vib337 最近免费中文字幕手机版|i7n198 一个人看的片在线www韩国|gei96 粗大挺进尤物人妻中文字幕|7ql671 五月天黄色网站|fg7255 欧美日韩国产|agw425 日本三级片网站|z8q484 午夜福利视频|oud72 亚洲视频在线观看|e8r725 天天干夜夜操|m8a259 午夜福利视频|yht404 三级片在线看|8dh549 免费的黄色网站|lw6789 樱花草视频在线观看www中文|mcb637 狼色精品人妻在线视频网站|q6y357 日韩在线视频|hhf279 精品国产伦一区二区三区在线观看|7sb412 在线视频精品|ny7429 免费a级毛片|lwp582 38在线电影|g7o29 樱花草视频在线观看www中文|wwk496 插插插综合|7qo496 欧产日产国产精品精品|7cl550 日日摸夜夜添夜夜添欧美|rs7637 99这里只有精品|fan410 欧美黄色视频|u6m319 丝瓜视频在线观看|dym546 久久精品国产96精品亚洲|6kd257 日日摸夜夜添夜夜添人人|wh6678